Page 61 - Glass-Technology International no. 3-2019
P. 61

agement decided to solve   laysia. The market has
                                                               problems step by step. In   become very demanding:
                                                               2014 they bought a LiSEC   on-time delivery, quality,
                                                               automatic cutting line and   reliability and cost com-
                                                               PKL crane system.        petitiveness are the con-
                                                               Before that employees at   stant values. With LiSEC
                                                               Crystal Safety Glass were   technologies we ensure our
                                                               carrying out these pro-  customers’ satisfaction at
                                                               cesses manually. After the   all time. We are still look-
                                                               installation, cutting and   ing for innovative ways to
                                                               loading operations became   improve our processes and
                                                               simple and fast. The to-  efficiency by using automa-
                                                               tal glass breakage during   tion and machinery. With
                                                               unloading was reduced to   that we can cut down de-
                                                               nearly zero. At the same   pendence on labour work-
                                                               time, the working environ-  force and minimize human
           trading company in 1992.   laysia, but a lot of products   ment was also improved.   error during operations.
           During the Asian Financial   are exported to Singapore,   Before the LiSEC loading   Cooperation with LiSEC
           Crisis in 1997 one of his   Thailand, Cambodia, Viet-  system was installed, there   has provided us with the
           customers who owed him   nam and Indonesia.         were four to five physical   breakthrough solution to
           money asked to offset his   Crystal Safety Glass is still   injuries every quarter, now   realize our glass processing
           debt with two containers   a family business run by   there are nearly none.   business value.”
           of glass. Tan knew about   Frank and his sister Yi Shin,   “Simple operation con-
           the possibilities of glass as   who both joined the compa-  trolled by software ensure
           a construction material.   ny in 2000. Their father had   that there are no errors in
           Seeing the opportunity,   been preparing his children   glass selection and cutting
           Tan changed his business   for business since they were   dimension. The software
           from trading glassware   young. Both of them put a   optimisation ensures the
           to trading glass. In 1998   lot of efforts in bringing the   precision of our output. The
           he borrowed money from   company to the next level.   high reliability of LiSEC ma-
                                                                                            LiSEC Group
           friends, moved into a rent-  They found that product   chines sostituire con:    LiSEC Group
           ed 3,000-square-foot shop   quality is vital as consumers’   has made our overall opera-
           lot and hired three people   expectations have increased   tions smooth and efficient.”
           for his new glass operation.  over the years. They de-  Thanks to the highly au-
                                    cided to move from selling   tomated loading system,
           CONTINUOUS               large quantities of glass at   Crystal Safety Glass was   Peter-Lisec-Straße 1
           UPTREND;                 cheap price and invested in   able to cut down the man-  3353 Seitenstetten - Austria
           CONTINUOUS               quality, productivity and a   power per operation from   Tel.: 0043-7477-4050
                                                                                             Fax: 0043-7477-40580
           PRODUCT QUALITY          safe working environment.   ten to three people, which   E-mail: sales@lisec.com
           Since its foundation the   The solution to reach this   helps the company in       www.lisec.com
           company has been on a    level was offered by LiSEC   terms of investment return
           continuous uptrend. Tan   in 2013.                  in the long run. Besides
           now employs 300 people                              that, workforce was trans-
           and the plant’s size has   SOLVING PROBLEMS         formed from low skilled to
           grown to 300,000 square   STEP BY STEP              higher skilled workers.
           feet, with another factory   The investment budget has
           of 400,000 square feet   always been a major fac-   FAST-CHANGING
           which opened at the end of   tor in making business de-  MARKET
           2018. The main sales mar-  cisions at Crystal Safety   “The glass industry is
           ket is domestic around Ma-  Glass, that is why the man-  changing very fast in Ma-




                                                                          Glass-Technology International 3/2019  59
   56   57   58   59   60   61   62   63   64   65   66