Page 102 - Glass-Technology International no. 5-2018
P. 102

CASE STUDY








           tle at a time to choose Forel   with the purchase of the   towards the arrissing line,
           also for the following in-  Forel Sorting System. After   which runs parallel to the
           vestments. Today we use a   considering other options   first one. However, up to
           edging line and an arrissing   available in the market, we   a couple of years ago, the
           one, which feed our IG unit   choose the SS for perfor-  panes had to be loaded ac-
           production line (all Forel):   mance and efficiency: we   cording to production or-
           the last one allows the as-  automated the management   der, to then be able to as-
           sembly of units with both   of glass sheets, simplifying   semble the insulating glass
           rigid and flexible spacers,   the work of the operator   units, while today this task
           depending on the orders.   and increasing productivity   is completely overcome. In
           However, we wanted to     and safety.”             fact, an automatic pane rec-
           take a step forward through                        ognition system is installed
           integrated logistics, a fun-  AUTOMATIC SYSTEMS    on the line’s infeed convey-
           damental component for    Today the workflow in     or, which measures length,
           any modern glassworks.    Artigianvetro begins with   height, thickness and any
           So, a year ago, we revolu-  cutting and continues to-  low-emission coating. This
           tionized our daily business   wards the edging line or   reading allows the software






















































           100 Glass-Technology International 5/2019
   97   98   99   100   101   102   103   104   105   106   107